
The Eastern White Pine timbers as they arrived at our shop (25-04-2006).
Timber cutting is almost completed (10-06-2006).
The excavation is going fast with the right equipment! (16-06-2006).
The foundations are in place and the first floor is almost completed (23-07-2006). A few Douglas fir timbers were cut on the field (27-07-2006).